CS507 Midterm Online Quiz

0%

CS507-Midterm

1 / 50

The comparison of the actual with the expected is done with the help of _______

2 / 50

Cost benefit analysis is a must in choosing an alternative in a decision making model.

3 / 50

The results given by the system after the process has been performed on the data being input to the system called as------------------.

4 / 50

In which of the following decisions the problems are non routine, critical and novel in nature, require individual judgment, evaluation and insight varying on case-to-case basis.

5 / 50

CBIS helps in updating every change being triggered in less time and with more effort.

6 / 50

Instead of Information, data is more important in day to day decision making.

7 / 50

______ is the set of interconnected structural elements that provide the framework.

8 / 50

__________ sources materials in which the information from secondary sources has been digested.

9 / 50

Organization is a group of elements that are integrated with the common purpose of achieving an object.

10 / 50

Distributing common information to every one may result ---------- and ---------.

11 / 50

Plans provide a direction but not framework for action. 

12 / 50

Organizations are distinguished on the basis of __________

13 / 50

Decision procedures can be pre-specified, but not enough to lead to the correct decision are called---------------

14 / 50

Which of the following views organization as a combination of process oriented groups whose information needs are related but Independent?

15 / 50

----------------- phase is required to establish the scope of the plan and the methodology and techniques to be applied.

16 / 50

Information systems based on Rational Man Model need to be based on availability of perfect and complete information on all alternatives so as to ensure certainty

17 / 50

Which of the following are knowledge workers who facilitate the development of information systems and computer applications by bridging the communications gap that exists between non technical system users, and System designers and developers?

18 / 50

Information system must fulfill the needs of which of the following:

19 / 50

Which of the following has collection of predefined procedures related to each other?

20 / 50

Receivables and payales are the information needs in __________

21 / 50

The systems development life cycle is a project management technique that divides complex projects into smaller, more easily managed segments or phases.

22 / 50

WaterFall model places emphasis on documentation (such as requirements documents and design documents) as well as source code.

23 / 50

The environment exerts influence on the system and the system also influences the environment.

24 / 50

The term information architecture describes a specialized ---------------- which

relates to the management of information and employment of informational tools.

25 / 50

Information quality checklist is the criteria to evaluate ______ of information.

26 / 50

Which of the following phase of decision making process involves implementing the selected course of action?

27 / 50

_________ sources are used, which simplify the process of finding the proximity Literature.

28 / 50

Which of the following are the examples of Primary sources?

29 / 50

The study of business problem domain used to recommend improvements and specify the business Requirements for the solution is called:

30 / 50

_______ is not connected with environment.

31 / 50

Software is constructed step by step in the same way a building is constructed is known as----------------

32 / 50

Devising a discount or training policy is an example of design phase.

33 / 50

Which of the following is one of the “Types of Problem”?

34 / 50

Which of the following is an international, multilateral organization, which was created as a result of the Uruguay round of discussion in 1994 to harmonic world trade.

35 / 50

How many phases are there in Decision making Process?

36 / 50

Cost benefit analysis is must in choosing an alternative in a decision making

model.

37 / 50

 

------------------- is a gray area lies between structured and unstructured range

where part of the decision can be specified allowing for certain factors out of

control.

38 / 50

The procedures to follow when decision is needed can be specified in advance

 

39 / 50

Debtor’s aging report is an example of the following phase?

40 / 50

Targeting advertising to customers to increase the probability, that an offer is accepted.

41 / 50

________ are run under direct supervision of family members.

42 / 50

Data mining can allow a firm to develop: DSS based on the Web and Specific marketing campaigns for different

43 / 50

Directories are example of __________ resource.

44 / 50

 Structured Problems possess multiple solutions, solution paths, fewer parameters which are less manipulate able, and contain uncertainty about which concepts, rules, and principles.

45 / 50

In data mining, events that are linked over time are referred to as:

46 / 50

---------- needs data preparation which may involve filtering data and data transformations, selecting subsets of records.

47 / 50

The comparison of actual system with expected system is done with the help of control mechanism.

48 / 50

 The organizational structures are formulated in order to efficiently manage which of the following:

49 / 50

Management is concerned with the day to day costs, production targets in ____

50 / 50

Evaluate recovery patterns, relevant costs involved is an example of monitoring

Your score is

The average score is 70%

0%

Qunoot e Nazilah
Dua e Hajat
4 Qul
6 Kalma
Dua-e-Akasha
Darood Akbar
Surah Fatiha
Dua-e-Ganj Ul Arsh
Dua-e-Jamilah
Ayat-ul-Kursi