Upon evaluating current problems and desired information (input and output), the analyst begins to _________.
2 / 50
Which one is the traditional software life cycle model?
3 / 50
You can use the Item Traceability Matrix to identify _______ at the end of each phase
4 / 50
The Introduction of the software requirements specification states the
5 / 50
Which along with CMM (capability maturity model) helps in creating effective software process model for any organization?
6 / 50
During the Implementation phase the software modules are coded and initial unit tests are performed.
7 / 50
These all are design phase activities except
8 / 50
________ is path finding________, is path following
9 / 50
The check-in and checkout facilities provide___________
10 / 50
are the methods or processes required in total , or in some combination, to achieve the goals
11 / 50
Synchronization control helps to ensure that parallel changes performed by two different people do .
12 / 50
Thy quality of software is said to be high if it meets the
13 / 50
Project management processes can be organized into _____________ groups
14 / 50
Controlling Versions is activity of
15 / 50
McCall (MCC77) and his colleagues proposed some software quality factors based on most important aspects of a software product:
16 / 50
Which of the following is not desirable to become a successful project manager?
17 / 50
The fourth, and current, phase of software solution began in the early
18 / 50
The final activity for a project manager is
19 / 50
identifying and documenting interactivity dependencies
20 / 50
ensures that appropriate steps to follow the product development procedures are earned out
21 / 50
Defined scope is a
22 / 50
A meeting is conducted at a _________ and attended by both software engineers and customers.
23 / 50
Risk analysis and management are a series of steps that help a software team to understand and manage ________.
24 / 50
25 / 50
A software project that meets all the stated objectives is a success of
26 / 50
During the period of , you will find that software that was produced was generally over budgeted, under scheduled, and of poor quality.
27 / 50
These all are outputs of Initiating Process except
28 / 50
The process of ensuring that the project is running in the right direction is called .
29 / 50
________ identifying which quality standards are relevant to the project and determining how to satisfy them.
30 / 50
Each process is described by:
31 / 50
Implementing software quality is often associated with the .
32 / 50
The Efficiency with which a program runs on different platforms or operating systems is called :
33 / 50
includes the processes required to ensure that the project is completed within the approved budget
34 / 50
To control versions, you can use _________.
35 / 50
McCall (MCC77 )and his colleagues proposed some software quality factors based on most important aspects of a software product:
36 / 50
Version control combines to manage different versions of configuration objects that are created during software product development.
37 / 50
The US DOD (1988) defines software quality rather simply as:
38 / 50
Each ________ can be subdivided into sub tasks.
39 / 50
Project management processes can be organized into groups?
40 / 50
These all are Product Operation Factors except
41 / 50
Reviews conducted at each of this phase/s
42 / 50
_______is the technical kernel of software engineering
43 / 50
________ theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins. Select correct option
44 / 50
The model serves as the basis for the creation of ________ for the Software.
45 / 50
Software project are carried out sequentially and that each phase is completed before the next is taken up.
46 / 50
47 / 50
Foundational design concepts are.
48 / 50
Requirements are refined and analyzed to assess their clarity, completeness, and_______
49 / 50
50 / 50
Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ________ by the project team. Select correct option: