CS615 Midterm Online Quiz

0%

CS615-Midterm

1 / 50

Upon evaluating current problems and desired information (input and output), the analyst begins to _________.

2 / 50

Which one is the traditional software life cycle model?

3 / 50

You can use the Item Traceability Matrix to identify _______ at the end of each phase

4 / 50

The Introduction of the software requirements specification states the

5 / 50

Which along with CMM (capability maturity model) helps in creating effective software process model for any organization?

6 / 50

During the Implementation phase the software modules are coded and initial unit tests are performed.

7 / 50

These all are design phase activities except

8 / 50

________ is path finding________, is path following

9 / 50

The check-in and checkout facilities provide___________

10 / 50

are the methods or processes required in total , or in some combination, to achieve the goals

11 / 50

Synchronization control helps to ensure that parallel changes performed by two different people do .

12 / 50

Thy quality of software is said to be high if it meets the

13 / 50

Project management processes can be organized into _____________ groups

14 / 50

Controlling Versions is activity of

15 / 50

McCall (MCC77) and his colleagues proposed some software quality factors based on most important aspects of a software product:

16 / 50

Which of the following is not desirable to become a successful project manager?

17 / 50

The fourth, and current, phase of software solution began in the early

18 / 50

The final activity for a project manager is

19 / 50

identifying and documenting interactivity dependencies

20 / 50

ensures that appropriate steps to follow the product development procedures are earned out

21 / 50

Defined scope is a

22 / 50

A meeting is conducted at a _________ and attended by both software engineers and customers.

23 / 50

Risk analysis and management are a series of steps that help a software team to understand and manage ________.

24 / 50

The Introduction of the software requirements specification states the

25 / 50

A software project that meets all the stated objectives is a success of

26 / 50

During the period of , you will find that software that was produced was generally over budgeted, under scheduled, and of poor quality.

27 / 50

These all are outputs of Initiating Process except

28 / 50

The process of ensuring that the project is running in the right direction is called .

29 / 50

________ identifying which quality standards are relevant to the project and determining how to satisfy them.

30 / 50

Each process is described by:

31 / 50

Implementing software quality is often associated with the .

32 / 50

The Efficiency with which a program runs on different platforms or operating systems is called :

33 / 50

includes the processes required to ensure that the project is completed within the approved budget

34 / 50

To control versions, you can use _________.

35 / 50

McCall (MCC77 )and his colleagues proposed some software quality factors based on most important aspects of a software product:

36 / 50

Version control combines to manage different versions of configuration objects that are created during software product development.

37 / 50

The US DOD (1988) defines software quality rather simply as:

38 / 50

Each ________ can be subdivided into sub tasks.

39 / 50

Project management processes can be organized into groups?

40 / 50

These all are Product Operation Factors except

41 / 50

Reviews conducted at each of this phase/s

42 / 50

_______is the technical kernel of software engineering

43 / 50

________ theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins. Select correct option

44 / 50

The model serves as the basis for the creation of ________ for the Software.

45 / 50

Software project are carried out sequentially and that each phase is completed before the next is taken up.

46 / 50

These all are outputs of Initiating Process except

47 / 50

Foundational design concepts are.

48 / 50

Requirements are refined and analyzed to assess their clarity, completeness, and_______

49 / 50

The fourth, and current, phase of software solution began in the early

50 / 50

Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ________ by the project team. Select correct option:

Your score is

The average score is 0%

0%

Qunoot e Nazilah
Dua e Hajat
4 Qul
6 Kalma
Dua-e-Akasha
Darood Akbar
Surah Fatiha
Dua-e-Ganj Ul Arsh
Dua-e-Jamilah
Ayat-ul-Kursi