CS615-Midterm
1 / 50
Project management processes can be organized into groups?
2 / 50
Which of the following might require re-baselining of the cost baseline?
3 / 50
Project management processes can be organized into _____________ groups
4 / 50
Decisions also have a--------------------element to them-the “right” decision may not be the "best' decision if it is made too early or too late.
5 / 50
ensures that appropriate steps to follow the product development procedures are earned out
6 / 50
—defining and refining objectives and selecting the best of the alternative courses of action to attain the objectives that the project was undertaken to address
7 / 50
A ‘facilitator’ controls the meeting can be _________.
8 / 50
Tools and techniques of the source selection process include all of the following except
9 / 50
________________ managing the relationship with the seller.
10 / 50
Software design is actually a multi-step process that focuses, on distinct attributes of a program.
11 / 50
Reviews conducted at each of this phase/s
12 / 50
These all are Product Operation Factors except
13 / 50
To manage costs for software projects, you need an accurate estimation of costs. To do that, there is a sequence of steps that you need to perform, mark first step in sequence to perform.
14 / 50
Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ________ by the project team. Select correct option:
15 / 50
McCall (MCC77 )and his colleagues proposed some software quality factors based on most important aspects of a software product:
16 / 50
The Introduction of the software requirements specification states the
17 / 50
The check-in and checkout facilities provide___________
18 / 50
Finally, the specification includes a ________
19 / 50
Upon evaluating current problems and desired information (input and output), the analyst begins to _________.
20 / 50
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement:
21 / 50
The model serves as a foundation for software
22 / 50
is responsible to plan, motivate, organize and control the people who do work on software.
23 / 50
A meeting is conducted at a _________ and attended by both software engineers and customers.
24 / 50
Auditing is activity of
25 / 50
Which of the following is a Technology related problem?
26 / 50
Controlling Versions is activity of
27 / 50
A baseline version __________
28 / 50
A software project that meets all the stated objectives is a success of _________
29 / 50
30 / 50
A review of the Software Requirements Specification is conducted by ________
31 / 50
The first activity in risk analysis is risk management.
32 / 50
The final activity for a project manager is
33 / 50
Predecessor activities need to ________ before the next can begin. After a predecessor activity is completed, the successor activity becomes the predecessor for another activity. Select correct option:
34 / 50
The British Standards Institution(1986) has stated the quality as
35 / 50
Software requirements engineering is a process of all except
36 / 50
Synchronization control helps to ensure that parallel changes performed by two different people do .
37 / 50
Using PERT and CPM, ________ , helps you complete a project on time. By using these techniques, you can determine the latest time by when an activity should start to be completed on time.
38 / 50
The model serves as the basis for the creation of ________ for the Software.
39 / 50
Dividing a software project into phases helps yon in managing the involved in the software project.
40 / 50
The Efficiency with which a program runs on different platforms or operating systems is called :
41 / 50
A node on a network schedule is that point in time at which an activity ________.
42 / 50
A Fuzzy user is a related problem.
43 / 50
Cognitive model describes a system as perceived by its _________.
44 / 50
In understanding the organizations focusing symbols and meaning related to events. Culture is also important. It is fall under .
45 / 50
Throughout evaluation and solution synthesis, the analyst's primary focus is on
46 / 50
The fourth, and current, phase of software solution began in the early
47 / 50
48 / 50
According to the 80/20 rule, 80 percent of the defects arise due to of the process issues.
49 / 50
_______is the technical kernel of software engineering
50 / 50
Product quality depends on its conformance to ______
Your score is
The average score is 0%
Restart quiz