CS615-Midterm
1 / 50
The check-in and checkout facilities provide___________
2 / 50
—defining and refining objectives and selecting the best of the alternative courses of action to attain the objectives that the project was undertaken to address
3 / 50
To control versions, you can use _________.
4 / 50
The fourth, and current, phase of software solution began in the early
5 / 50
What limits the options of the project team?
6 / 50
Project Cost Management includes the processes one of them is
7 / 50
Using PERT and CPM, ________ , helps you complete a project on time. By using these techniques, you can determine the latest time by when an activity should start to be completed on time.
8 / 50
All of the following describe the activity list except:
9 / 50
Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ________ by the project team. Select correct option:
10 / 50
Which organization has set the de facto standards for project management techniques?
11 / 50
The model serves as a foundation for software
12 / 50
Risk analysis and management are a series of steps that help a software team to understand and manage ________.
13 / 50
Which one is the traditional software life cycle model?
14 / 50
The model serves as a foundation for software design and as the basis for the creation of _________ for the Software.
15 / 50
________ is a software engineering task that bridges the gap between system level requirements engineering and software design.
16 / 50
Tools and techniques of the source selection process include all of the following except
17 / 50
Cognitive model describes a system as perceived by its _________
18 / 50
Finally, the specification includes a ________
19 / 50
Large corporations realized the benefits of using computers in .
20 / 50
A good system allows you to access relevant information and make informed decisions.
21 / 50
insures that the standards laid down for a preset are followed.
22 / 50
23 / 50
According to the 80/20 rule, 80 percent of the defects arise due to of the process issues.
24 / 50
Each process is described by .
25 / 50
A Fuzzy user is a related problem.
26 / 50
Synchronization control helps to ensure that parallel changes performed by two different people do .
27 / 50
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement:
28 / 50
We can classify the problems that affect software projects into categories
29 / 50
These all are outputs of Initiating Process except
30 / 50
Software design is actually a multi-step process that focuses, on distinct attributes of a program.
31 / 50
means that every project has a definite beginning and a definite end.
32 / 50
Project management is a _________of constant communication and negotiation.
33 / 50
Reviews conducted at each of this phase/s
34 / 50
You can use the Item Traceability Matrix to identify _______ at the end of each phase
35 / 50
The British Standards Institution(1986) has stated the quality as
36 / 50
________________ managing the relationship with the seller.
37 / 50
McCall (MCC77) and his colleagues proposed some software quality factors based on _________ most important aspects of a software product:
38 / 50
Throughout evaluation and solution synthesis, the analyst's primary focus is on
39 / 50
McCall (MCC77) and his colleagues proposed some software quality factors based on most important aspects of a software product:
40 / 50
The quality of software is said to be high if it meets the
41 / 50
The final activity for a project manager is
42 / 50
identifying and documenting interactivity dependencies
43 / 50
includes consideration such as the post-implementation support activities provided to the customer.
44 / 50
Defined scope is a
45 / 50
ensures that appropriate steps to follow the product development procedures are earned out
46 / 50
only one is the output of Initiating Process
47 / 50
Which of the following is a project execution task?
48 / 50
Software project are carried out sequentially and that each phase is completed before the next is taken up.
49 / 50
Low motivation is a____ related problem.
50 / 50
Your score is
The average score is 0%
Restart quiz