CS615-Midterm
1 / 50
insures that the standards laid down for a preset are followed.
2 / 50
According to the 80/20 rule, 80 percent of the defects arise due to of the process issues.
3 / 50
Project management processes can be organized into _____________ groups
4 / 50
________ is a software engineering task that bridges the gap between system level requirements engineering and software design.
5 / 50
Software requirements engineering is a process of all except
6 / 50
Software design is actually a multi-step process that focuses on distinct attributes of a program
7 / 50
Identify the category of people who do actual work on software development.
8 / 50
A good system allows you to access relevant information and make informed decisions.
9 / 50
Which along with CMM (capability maturity model) helps in creating effective software process model for any organization?
10 / 50
is an umbrella activity that ensures conformance to standards and procedures throughout the SDLC of a software product.
11 / 50
________ identifying which quality standards are relevant to the project and determining how to satisfy them.
12 / 50
Foundational design concepts are.
13 / 50
Upon evaluating current problems and desired information (input and output), the analyst begins to _________.
14 / 50
The British Standards Institution (1986) has stated the quality as
15 / 50
A software project that meets all the stated objectives is a success of _________
16 / 50
In understanding the organizations focusing symbols and meaning related to events. Culture is also important. It is fall under .
17 / 50
Product quality depends on its conformance to ______
18 / 50
A baseline version __________
19 / 50
The Efficiency with which a program runs on different platforms or operating systems is called :
20 / 50
Throughout evaluation and solution synthesis, the analyst's primary focus is on
21 / 50
McCall (MCC77) and his colleagues proposed some software quality factors based on most important aspects of a software product:
22 / 50
The fourth, and current, phase of software solution began in the early
23 / 50
24 / 50
You can use the Item Traceability Matrix to identify _______ at the end of each phase
25 / 50
Project management is a _________of constant communication and negotiation.
26 / 50
Synchronization control helps to ensure that parallel changes performed by two different people do .
27 / 50
Software design is actually a multi-step process that focuses, on distinct attributes of a program.
28 / 50
29 / 50
In problem evaluation area of effort, once problems have been identified, the ___________determines what information is to be produced by the new system and what data will be provided to the system.
30 / 50
Low motivation is a____ related problem.
31 / 50
All of the following describe the activity list except:
32 / 50
includes the processes required to ensure that the project is completed within the approved budget
33 / 50
The first activity in risk analysis is risk management.
34 / 50
In problem evaluation area of effort, once problems have been identified, the determines what information is to be produced by the new system and what data will be provided to the system.
35 / 50
We can classify the problems that affect software projects into categories
36 / 50
McCall (MCC77) and his colleagues proposed some software quality factors based on _________ most important aspects of a software product:
37 / 50
38 / 50
The check-in and checkout facilities provide___________
39 / 50
—defining and refining objectives and selecting the best of the alternative courses of action to attain the objectives that the project was undertaken to address
40 / 50
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement:
41 / 50
Cognitive model describes a system as perceived by its _________
42 / 50
These all are Product Revision Factors except
43 / 50
The quality of software is said to be high if it meets the
44 / 50
Risk analysis and management are a series of steps that help a software team to understand and manage ________.
45 / 50
46 / 50
Configuration control tools include
47 / 50
Which organization has set the de facto standards for project management techniques?
48 / 50
These all are Product Transition Factors except.
49 / 50
identifying and documenting interactivity dependencies
50 / 50
________________ managing the relationship with the seller.
Your score is
The average score is 0%
Restart quiz