CS615-Midterm
1 / 50
Software project are carried out sequentially and that each phase is completed before the next is taken up.
2 / 50
The fourth, and current, phase of software solution began in the early
3 / 50
The Introduction of the software requirements specification states the
4 / 50
Defined scope is a
5 / 50
These all are Product Operation Factors except
6 / 50
Each process is described by .
7 / 50
We can classify the problems that affect software projects into categories
8 / 50
Software design is actually a multi-step process that focuses, on distinct attributes of a program.
9 / 50
10 / 50
The quality of software is said to be high if it meets the
11 / 50
insures that the standards laid down for a preset are followed.
12 / 50
only one is the output of Initiating Process
13 / 50
These all are outputs of Initiating Process except
14 / 50
is an umbrella activity that ensures conformance to standards and procedures throughout the SDLC of a software product.
15 / 50
is responsible to plan, motivate, organize and control the people who do work on software.
16 / 50
17 / 50
You can use the Item Traceability Matrix to identify _______ at the end of each phase
18 / 50
A Fuzzy user is a related problem.
19 / 50
includes consideration such as the post-implementation support activities provided to the customer.
20 / 50
The check-in and checkout facilities provide___________
21 / 50
are the methods or processes required in total , or in some combination, to achieve the goals
22 / 50
A baseline version __________
23 / 50
________ is a software engineering task that bridges the gap between system level requirements engineering and software design.
24 / 50
25 / 50
In problem evaluation area of effort, once problems have been identified, the determines what information is to be produced by the new system and what data will be provided to the system.
26 / 50
Predecessor activities need to ________ before the next can begin. After a predecessor activity is completed, the successor activity becomes the predecessor for another activity. Select correct option:
27 / 50
The US DOD (1988) defines software quality rather simply as
28 / 50
Throughout evaluation and solution synthesis, the analyst's primary focus is on
29 / 50
________________ managing the relationship with the seller.
30 / 50
Which along with CMM (capability maturity model) helps in creating effective software process model for any organization?
31 / 50
The Efficiency with which a program runs on different platforms or operating systems is called :
32 / 50
These all are Product Revision Factors except.
33 / 50
34 / 50
In understanding the organizations focusing symbols and meaning related to events. Culture is also important. It is fall under .
35 / 50
Project management processes can be organized into _____________ groups
36 / 50
To manage costs for software projects, you need an accurate estimation of costs. To do that, there is a sequence of steps that you need to perform, mark first step in sequence to perform.
37 / 50
A review of the Software Requirements Specification is conducted by ________
38 / 50
Dividing a software project into phases helps yon in managing the involved in the software project.
39 / 50
A good system allows you to access relevant information and make informed decisions.
40 / 50
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement:
41 / 50
Large corporations realized the benefits of using computers in .
42 / 50
Identify the category of people who do actual work on software development.
43 / 50
_______is the technical kernel of software engineering
44 / 50
These all are design phase activities except
45 / 50
Which of the following might require re-baselining of the cost baseline?
46 / 50
Controlling Versions is activity of
47 / 50
The US DOD (1988) defines software quality rather simply as:
48 / 50
Tools and techniques of the source selection process include all of the following except
49 / 50
Foundational design concepts are.
50 / 50
Version control combines to manage different versions of configuration objects that are created during software product development.