CS507-Midterm
1 / 50
The comparison of actual system with expected system is done with the help of control mechanism.
2 / 50
_______ is a group of elements that are integrated with common purpose of objective.
3 / 50
Which of the following has collection of predefined procedures related to each other?
4 / 50
Companies are investing in data-driven decision support application frameworks to help them respond to • Changing market conditions • Customer needs
5 / 50
System design can be explained and presented in -------------------- form.
6 / 50
With a ----------------decision environment, there is the possibility of having very quick and very accurate feedback on the decision process.
7 / 50
A system is a group of ------------------------------that are integrated with the common purpose of achieving an objective.
8 / 50
Which of the following models are an approach for developing systems based on producing deliverables frequently/repetitively?
9 / 50
Decision support systems are designed to be ad hoc and quick-response systems which are initiated and controlled by decision makers.
10 / 50
Computer-aided manufacturing (CAM), is a form of automation where computers communicate work instructions directly to the manufacturing machinery.
11 / 50
Which of the following phase of decision making process involves selecting a course of action from those available?
12 / 50
Cheaper factor of production is a challenge for the survival of a company in which of the following market?
13 / 50
WaterFall model places emphasis on documentation (such as requirements documents and design documents) as well as source code.
14 / 50
Management is concerned with the day to day costs, production targets in ____
15 / 50
Information by itself is proving to be the most critical resource for organizations.
16 / 50
Organizational culture is the specific collection of values and norms that are shared by people and groups in an organization and that control the way they interact with each other and with stakeholders outside the
17 / 50
Information systems based on Rational Man Model need to be based on availability of perfect and complete information on all alternatives so as to ensure certainty
18 / 50
Decision procedures can be pre-specified, but not enough to lead to the correct decision are called---------------
19 / 50
The purpose of feasibility Study is to obtain a commitment to change and to evaluate whether cost effective solutions are available to address the problem or opportunity that has been identified.
20 / 50
Organizational culture is the specific collection of values and norms that are
shared by people and groups in an organization and that control the way they
interact with each other and with stakeholders outside the
21 / 50
Plans provide a direction but not framework for action.
22 / 50
DSS can stimulate innovation in decision making by helping managers to existing decision making procedures.
23 / 50
---------- needs data preparation which may involve filtering data and data transformations, selecting subsets of records.
24 / 50
High level of foreign trade has resulted in imports and exports which require inter linkage for smooth coordination.
25 / 50
The system used to record the transactions of routine and repetitive nature is called as _________ .
26 / 50
________ are run under direct supervision of family members.
27 / 50
Targeting advertising to customers to -------------- the probability, that an offer is accepted.
28 / 50
The comparison of the actual with the expected is done with the help of _______
29 / 50
In ______ style managers allow employees to take part in decision making.
30 / 50
------- seek to put intelligence into the hardware in the form of generalized capability to learn.
31 / 50
Receivables and payables are the information needs in __________
32 / 50
33 / 50
The environment exerts influence on the system and the system also influences the environment.
34 / 50
Due to fluctuating changes in fashion trends, pre-seasonal planning becomes---------
35 / 50
Which of the following design involves breaking up the logical design into units?
36 / 50
The term information architecture describes a specialized ---------------- which
relates to the management of information and employment of informational tools.
37 / 50
Which of the following is a method of software/ Information System
development where the model is designed, implemented and tested incrementally
until the product development is completed?
38 / 50
Which of the following are knowledge workers who facilitate the development of information systems and computer applications by bridging the communications gap that exists between non technical system users, and System designers and developers?
39 / 50
In which of the following decisions the problems are non routine, critical and novel in nature, require individual judgment, evaluation and insight varying on case-to-case basis.
40 / 50
CBIS helps in updating every change being triggered in less time and with more effort.
41 / 50
Every transaction that an organization undertakes has a financial impact, to be recorded and reported by the accounts & finance department.
42 / 50
_______ is not connected with environment.
43 / 50
-----------------Well-structured problems are constrained problems with convergent solutions that engage the application of a limited number of rules and principles within well-defined parameters.
44 / 50
_________ is a group of people organized to accomplish an overall goal
45 / 50
Data mining can allow a firm to develop: DSS based on the Web and Specific marketing campaigns for different
46 / 50
RAID model combines the elements of the waterfall model with the philosophy of prototyping.
47 / 50
_______ is the raw data entered in the computer system.
48 / 50
---------------- helps in getting the right material and physical resources together at
the right place and at the right time to meet the customer's requirements.
49 / 50
______ is the set of interconnected structural elements that provide the framework.
50 / 50
Board of Directors are elected from ___________
Your score is
The average score is 70%
Restart quiz