Home » VU University » Final Term Quiz » CS615 Final Term Quiz 1

CS615 Final Term Quiz 1

0%
1

CS615 Final Term Quiz 1

1 / 25

________ identifying which quality standards are relevant to the project and determining how to satisfy them.

2 / 25

____________ is another term for top down estimating.

3 / 25

A baseline version __________

4 / 25

________of the system is an effort to better understand data and control flow, functional processing, operational behavior, and information content.

5 / 25

------------- refers to the quantifiable outcome of the software project.

6 / 25

A ______ extends the Program WBS to a lower level in order to provide management and cost information to the Government.

7 / 25

? ensures that appropriate steps to follow the product development procedures are carried out

8 / 25

________ theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins.

9 / 25

_______is the technical kernel of software engineering

10 / 25

A ?facilitator? controls the meeting can be ________

11 / 25

A meeting is conducted at a _________ and attended by both software engineers and customers.

12 / 25

______ is based on soft skills and relies more on human factors, such as collecting information during group discussions.

13 / 25

A change in the arrangement of tasks can occur on the basis of ______ theories of WBS.

14 / 25

__________contains an analysis of what went wrong, what went right, and what you could have done better in the software project.

15 / 25

-------------- completion and settlement of the contract, including resolution of any open items.

16 / 25

__________ involves determining what qualities are to be used to perform project activities.

17 / 25

_______is the technical kernel of software engineering

18 / 25

________ is identifying the specific activities that must be performed to produce the various project deliverables.

19 / 25

A node on a network schedule is that point in time at which an activity ________.

20 / 25

________ theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins. Select correct option

21 / 25

_____ identifying and documenting interactivity dependencies.

22 / 25

________ is path finding________, is path following

23 / 25

A meeting is conducted at a _______ and attended by both software engineers and customers.

24 / 25

A ?facilitator? controls the meeting can be _________.

25 / 25

________ is a software engineering task that bridges the gap between system level requirements engineering and software design.

Provide Your Information

Your score is

The average score is 32%

0%

Share on facebook
Facebook
Share on twitter
Twitter
Share on whatsapp
WhatsApp
CS001 Final Term Quiz 1
CS001 Final Term Quiz 2
CS101 Final Term Quiz 1
CS101 Final Term Quiz 2
CS101 Final Term Quiz 3
CS101 Final Term Quiz 4
CS101 Final Term Quiz 5
CS101 Final Term Quiz 6
CS101 Final Term Quiz 7
CS101 Final Term Quiz 8

Help Concept 360 Please. We need 500 Youtube Subscriber. Please Subscribe our Youtube Channel. Click below link to subscribe Please

آپ سے گزارش ہے کہ ہمارے یوٹیوب چینل کوسبسکرائب کر کے ہماری مدد کریں جیسا کہ یہ ویب سائٹ آپکی مدد کر رہی ہے۔ شکریہ