CS615-Midterm
1 / 50
Implementing software quality is often associated with the .
2 / 50
The fourth, and current, phase of software solution began in the early
3 / 50
Product quality depends on its conformance to ______
4 / 50
Cognitive model describes a system as perceived by its _________.
5 / 50
Synchronization control helps to ensure that parallel changes performed by two different people do_________.
6 / 50
________ is path finding________, is path following
7 / 50
Requirements are refined and analyzed to assess their clarity, completeness, and_______
8 / 50
Which one is the traditional software life cycle model?
9 / 50
These all are design phase activities except
10 / 50
ensures that appropriate steps to follow the product development procedures are earned out
11 / 50
McCall (MCC77) and his colleagues proposed some software quality factors based on most important aspects of a software product:
12 / 50
The Introduction of the software requirements specification states the
13 / 50
McCall (MCC77 )and his colleagues proposed some software quality factors based on most important aspects of a software product:
14 / 50
A meeting is conducted at a _________ and attended by both software engineers and customers.
15 / 50
are the methods or processes required in total , or in some combination, to achieve the goals
16 / 50
Project Cost Management includes the processes one of them is
17 / 50
includes consideration such as the post-implementation support activities provided to the customer.
18 / 50
Which of the following is not desirable to become a successful project manager?
19 / 50
Project management processes can be organized into groups?
20 / 50
All of the following describe the activity list except:
21 / 50
A software project that meets all the stated objectives is a success of _________
22 / 50
Cognitive model describes a system as perceived by its _________
23 / 50
A baseline version __________
24 / 50
These all are Product Transition Factors except.
25 / 50
The check-in and checkout facilities provide___________
26 / 50
To ________risks from occurring, the project team prepares the risk plan before the commencement of the project.
27 / 50
Software design is actually a multi-step process that focuses, on distinct attributes of a program.
28 / 50
The British Standards Institution(1986) has stated the quality as
29 / 50
During the Implementation phase the software modules are coded and initial unit tests are performed.
30 / 50
What limits the options of the project team?
31 / 50
The Efficiency with which a program runs on different platforms or operating systems is called :
32 / 50
Predecessor activities need to ________ before the next can begin. After a predecessor activity is completed, the successor activity becomes the predecessor for another activity. Select correct option:
33 / 50
The model serves as a foundation for software
34 / 50
means that every project has a definite beginning and a definite end.
35 / 50
________ theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins. Select correct option
36 / 50
Which of production volume usually comes from of the producers.
37 / 50
Using PERT and CPM, ________ , helps you complete a project on time. By using these techniques, you can determine the latest time by when an activity should start to be completed on time.
38 / 50
—defining and refining objectives and selecting the best of the alternative courses of action to attain the objectives that the project was undertaken to address
39 / 50
A review of the Software Requirements Specification is conducted by ________
40 / 50
To control versions, you can use _________.
41 / 50
is responsible to plan, motivate, organize and control the people who do work on software.
42 / 50
43 / 50
Throughout evaluation and solution synthesis, the analyst's primary focus is on
44 / 50
The US DOD (1988) defines software quality rather simply as
45 / 50
Defined scope is a
46 / 50
The British Standards Institution (1986) has stated the quality as
47 / 50
These all are Product Operation Factors except
48 / 50
Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ________ by the project team. Select correct option:
49 / 50
These all are outputs of Initiating Process except
50 / 50
We can classify the problems that affect software projects into categories
Your score is
The average score is 0%
Restart quiz