CS615-Midterm
1 / 50
ensures that appropriate steps to follow the product development procedures are earned out
2 / 50
A review of the Software Requirements Specification is conducted by ________
3 / 50
You can use the Item Traceability Matrix to identify _______ at the end of each phase
4 / 50
are the methods or processes required in total , or in some combination, to achieve the goals
5 / 50
Product quality depends on its conformance to ______
6 / 50
The model serves as the basis for the creation of ________ for the Software.
7 / 50
Dividing a software project into phases helps yon in managing the involved in the software project.
8 / 50
The Introduction of the software requirements specification states the
9 / 50
Defined scope is a
10 / 50
Software project are carried out sequentially and that each phase is completed before the next is taken up.
11 / 50
includes the processes required to ensure that the project is completed within the approved budget
12 / 50
The Efficiency with which a program runs on different platforms or operating systems is called :
13 / 50
Reviews conducted at each of this phase/s
14 / 50
Upon evaluating current problems and desired information (input and output), the analyst begins to _________.
15 / 50
Most software project manager’s practice a lot of management techniques that are of doubtful authenticity are called
16 / 50
Which of the following might require re-baselining of the cost baseline?
17 / 50
These all are outputs of Initiating Process except
18 / 50
Software design is actually a multi-step process that focuses, on distinct attributes of a program.
19 / 50
20 / 50
Thy quality of software is said to be high if it meets the
21 / 50
Cognitive model describes a system as perceived by its _________.
22 / 50
These all are Product Revision Factors except.
23 / 50
Which of production volume usually comes from of the producers.
24 / 50
Decisions also have a--------------------element to them-the “right” decision may not be the "best' decision if it is made too early or too late.
25 / 50
Which organization has set the de facto standards for project management techniques?
26 / 50
Predecessor activities need to ________ before the next can begin. After a predecessor activity is completed, the successor activity becomes the predecessor for another activity. Select correct option:
27 / 50
The British Standards Institution(1986) has stated the quality as
28 / 50
Project management processes can be organized into _____________ groups
29 / 50
Which of the following is not desirable to become a successful project manager?
30 / 50
The fourth, and current, phase of software solution began in the early
31 / 50
Which along with CMM (capability maturity model) helps in creating effective software process model for any organization?
32 / 50
Foundational design concepts are.
33 / 50
34 / 50
Cognitive model describes a system as perceived by its _________
35 / 50
Project management processes can be organized into groups?
36 / 50
Controlling Versions is activity of
37 / 50
A Fuzzy user is a related problem.
38 / 50
Project Cost Management includes the processes one of them is
39 / 50
Using PERT and CPM, ________ , helps you complete a project on time. By using these techniques, you can determine the latest time by when an activity should start to be completed on time.
40 / 50
Finally, the specification includes a ________
41 / 50
is an umbrella activity that ensures conformance to standards and procedures throughout the SDLC of a software product.
42 / 50
Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ________ by the project team. Select correct option:
43 / 50
Each process is described by .
44 / 50
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement:
45 / 50
________________ managing the relationship with the seller.
46 / 50
_______is the technical kernel of software engineering
47 / 50
All of the following describe the activity list except:
48 / 50
49 / 50
We can classify the problems that affect software projects into categories
50 / 50
Synchronization control helps to ensure that parallel changes performed by two different people do_________.